https://i109.fastpic.ru/big/2019/0505/58/bf7116434a7eb15a9e6ffa7844d7e758.jpg
Datamine NPV Scheduler 4.30.55.0 (x64)
x64 | Languages:English | File Size: 266 MB
Description:
A complete strategic open pit mine planning system - NPV Scheduler has functionalities spanning everything from pit optimisation, pushback generation, cut-off grade optimisation, scheduling, haulage optimisation and stockpile management. The advanced system caters for alternative techniques beyond NPV for pit optimisation to take account of material blending requirements or to maximise mine life.

The innovative pushback generator delivers the most practical pushbacks of any competing product and the scheduling capability includes optimisation techniques that look ahead to the entire life of the mine as opposed to considering just one period at a time.
Key Features:
Determining Pushback Shapes:
Pushbacks are based on LG phases, but practical mining requires careful formation of the final pushback shapes. NPV Scheduler bases the pushbacks on LG phases, bit it also optimises the pushback shapes for practical mining, while retaining the maximum possible NPV.
Visualisation, Animation & Reporting:
NPV Scheduler delivers a wide variety of reporting and visualisation options and formats, from full reports with customisable content to 3D rendered life of mine animations.
Mine Flow Optimiser (MFO):
MFO increases NPV by optimising cut-off grade. It adjusts the schedule to create more value by mining higher grade or ore earlier in the schedule when that outweighs the cost of wasting or stockpiling lower grade ore.
System Requirements:
Windows 7/8.1/10 (x64)
CPU:Intel dual core processor
Memory:4 Gb RAM
DirectX compatible graphics card with at least 64Mb on-board memory.Whats New:
-You can now use external sources when scheduling.
-The NPVS copyright notice has been updated
-Long field name (
-Pre-stripping benches are now visible on the Schedule by Bench report.
-A data-specific issue preventing truck hours from being reported in a multimine (.mms) project has been resolved.
-An issue in multimine projects where deleting the sink rate target for one or more pushbacks corrupts pushback targets has been resolved.
-Dependencies are now preserved as expected when swapping between Sequential, Sequential + Custom and Custom types.
-You can now copy /paste economic model settings from single to multimine projects.
-A data-specific issue causing obstacle costs to be reported in the wrong LG phase has been corrected.
-Rock by Mine Variables is now available in the All Mines report options.
-A problem preventing the import of a surface where a rotated model was loaded has been resolved.
-A problem that could force the system to halt unexpectedly when generating the economic model with all product recoveries set to 1 has been resolved.
-An issue preventing the import with models with 1000 cells+ in one axis has been resolved. Users are now offered the option to reblock.
-A data-specific issue causing the system to fail when generating a scheduler report has been resolved.
-An issue preventing the IJK sorting of a results model has been resolved.
-An issue causing the system to halt unexpectedly when recalculating the OES has been resolved.
-A project-specific instance of system failure when deleting section sheets or moving between them after pit optimization has been resolved.
-An issue preventing stockpile reclaim has been resolved.
-An issue preventing the scheduler mining all benches when using the maximum mining rate per bench has been resolved.
-An incorrect warning of differing block numbers between the scheduler and pushback generator has been resolved.
-Unloaded imported surfaces no longer incorrectly appear in the project data tree after reopening the project.
-A data-specific issue where the net value of a block is exactly zero no longer causes unexpected spikes in generated pit surface data.
-An instance of system failure when running MFO then assigning a grade constraint has been resolved.
-A misleading screen allowing in-file item selection in the MineSight 2D Surfaces dialog has been removed.
Screenshots
https://i109.fastpic.ru/big/2019/0505/ff/cc554a01f7aec954b35c0386b53f4dff.jpg
Homepage

Код:
https://www.dataminesoftware.com/

Recommend download скачать Link Hight Speed | Please Say Thanks Keep Topic Live

Код:
https://uploadgig.com/file/download скачать/471b47e45c0E4Cdb/4ymq0.Datamine.NPV.Scheduler.4.30.55.0.x64.rar
https://rapidgator.net/file/f4fd74e5211c1d366271286bdd92c941/4ymq0.Datamine.NPV.Scheduler.4.30.55.0.x64.rar
https://nitroflare.com/view/A14BCE78313CA72/4ymq0.Datamine.NPV.Scheduler.4.30.55.0.x64.rar